Question:
A company produces items in small batches The machinery
Last updated: 2/25/2024
A company produces items in small batches The machinery needs to warm up before the items can be produced The scatterplot shows the time needed to produce batches of different numbers of items 100 80 60 X 5 60 40 3 44 20 4 6 8 10 Items produced Production time minutes Based on the line of best fit which of these statements is true O A As the number of items in a batch increases by 1 the production time increases by 12 minutes OB As the number of items in a batch increases by 1 the production time increases by 20 minutes O C It takes about 20 minutes for the equipment to warm up OD It takes about 60 minutes for the equipment to warm up