A mining company owns two mines These mines produce an ore
Last updated: 12/7/2023
A mining company owns two mines These mines produce an ore that can be graded into two classes regular grade and low grade The company must produce at least 420 tons of regular grade and 540 tons of low grade ore per week The first mine produces 6 tons of regular grade and 18 tons of low grade ore per hour The second mine produces 18 tons of regular grade and 9 tons of low grade ore per hour The operating cost of the first mine is 20 000 per hour and the operating cost of the second mine is 9500 per hour The first mine can be operated no more than 37 hours a week and the second mine can be operated no more than 28 hours a week How many hours per week should each mine be operated to minimize the cost Note that the ALEKS graphing calculator can be used to make computations easier hour s Second mine hour s First mine