A work sampling study is to be conducted on rush hour
Last updated: 1/11/2024
A work sampling study is to be conducted on rush hour traffic 4 00 p m to 6 59 p m five days per week The study will encompass 40 days Determine the day hour and minute for 10 observations using the following procedure and table 1 2 1 6912 7264 2 3491 1192 3 4715 2486 3264 1918 4 5 8510 4237 2044 3957 1632 1546 1950 1844 7209 0938 2376 6 3950 1328 7343 6083 7 7871 7752 0521 8511 8 2716 9 2935 10 8533 11 8818 9912 3761 4028 9207 9585 1039 2159 2438 2768 4666 9530 3352 2951 0131 4359 3095 4421 3018 1396 7354 0249 8259 9957 0538 1640 12 3 4 2811 8921 0575 7547 2093 2776 2664 3856 1123 0120 2128 3956 7728 Observation 1 a Read two digit numbers going down the first two digits of column 1 e g 69 34 47 and then down the second two digits of that column e g 12 9115 for days b For hours read one digit numbers going from left to right across row 3 and then across row 4 Read only 4s 5s and 6s c For minutes read two digit numbers going down column 1 first using the last two digits e g 12 91 15 and after exhausting those numbers repeat using the first two digits of that column e g 69 34 47 16 2 3 4 Arrange your times chronologically by day then hour and then minute Enter hours as a single digit 4 5 or 6 without a leading zero Day 5 4627 Time 6 8387 4617 16 33 38 15