Question:

municipal manager wants to put the system back to work as a

Last updated: 10/30/2023

municipal manager wants to put the system back to work as a

municipal manager wants to put the system back to work as a small hydroelectric system to help supply the borough s electricity Does this idea make sense How much power could this system produce The height difference between the mill race and the tailrace is ten feet 3 meters and the stream can supply on average 100 cubic feet of water per second 2 8 m 3 sec The planned turbine would be 72 efficient under those conditions Power watts density of water height flow rate acceleration of gravity coefficient of efficiency NOTE the coefficient of gravity is 9 81 for this problem Don t round your answers Question 2 20 pts