Question:
power plant L N Length underground in miles 12 x Length
Last updated: 4/11/2023
power plant L N Length underground in miles 12 x Length underwater in miles Minimal cost in dollars 7328 2 offshore facility x T D power line is to be run to an offshore facility as shown in the figure above The offshore facility is D 4 miles at sea and L 12 miles along the shoreline from the power plant It costs 450 per mile to lay a power line underground and 700 per mile to run the line underwater How much of the power line should be run underground and how much underwater to minimize the overall costs help numbers