Question:
question below A manufacturer produces two models of
Last updated: 2/21/2023
question below A manufacturer produces two models of mountain bikes Model A requires 5 hours of assembly time and 2 hours of painting time and Model B requires 4 hours of assembly time and 3 hours of painting time The maximum total weekly hours available in the assembly department and the painting department are 200 hours and 108 hours respectively The profits per unit are 25 for Model A and 15 for Model B How many of each type should be produced to maximize profit 54 Xbikes of Model A 0 bikes of Model B