Question:

Two pools are being filled with water. To start, the first

Last updated: 7/19/2022

Two pools are being filled with water. To start, the first

Two pools are being filled with water. To start, the first pool had 819 liters of water and the second pool was empty. Water is being added to the first pool at a rate of 18 liters per minute. Water is being added to the second pool at a rate of 39 liters per minute. Let x be the number of minutes water has been added.