Question:
In a hydroelectric plant the available head is 80 m for a
Last updated: 6/9/2023
![In a hydroelectric plant the available head is 80 m for a](https://media.kunduz.com/media/sug-question-candidate/20210517171639648285-2813795.jpg?h=512)
In a hydroelectric plant the available head is 80 m for a discharge 12m sec and overall efficiency of the Power Station of 80 The specific weight of water is 9 81 k m2 Then the power developed is in MW