Question:

power plant L Z gth underground in miles gth underwater in

Last updated: 4/10/2023

power plant L Z gth underground in miles gth underwater in

power plant L Z gth underground in miles gth underwater in miles mal cost in dollars offshore facility X ower line is to be run to an offshore facility as shown in the figure above The offshore facility es at sea and L 12 miles along the shoreline from the power plant It costs 450 per mile ver line underground and 700 per mile to run the line underwater D y much of the power line should be run underground and how much underwater to minimize ts help numbers