Question:

The construction crew for a new store will dig a hole in the

Last updated: 4/11/2023

The construction crew for a new store will dig a hole in the

The construction crew for a new store will dig a hole in the shape of a rectangular prism for the store s foundation The will be 17 yd long 14 yd wide and 4 yd deep To haul away all of the dirt from the hole a dump truck will take trips to a nearby landfill The crew knows the amount of dirt the truck can hold each trip in cubic feet a Find the volume of dirt that will be hauled away in cubic feet Use the table of conversion facts as needed b Each trip the truck can haul away 310 ft of dirt To save gas the crew wants to take as few trips as necessary to haul all of the dirt away Since all of the dirt needs to be hauled away the crew might have to take a partial load for one trip How many trips are needed to haul away all of the dirt Count each trip it makes the same even if the truck isn t full trips c If it costs 1225 for each trip that the truck makes how much will it cost to haul away all the dirt 0 Conversion facts for length 1 foot ft 12 inches in 1 yard yd 1 yard yd 3 feet ft 36 inches in