Question:

A tunnel is being constructed through a mountain range where

Last updated: 3/26/2024

A tunnel is being constructed through a mountain range where

A tunnel is being constructed through a mountain range where the tunnel is being constructed from both ends at the same time One end of tunnel starts at the point A 354 310 299 and s constructed in a straight line in the direction 71 61 6k whilst the other end of tunnel starts at the point B 156 150 81 and is constructed in a straight line in the direction 81 8j 4k The starting points and the direction vectors of both ends of the tunnel are measured in metres Verify that the tunnels being constructed from both ends meet by first finding the vector form of the equations of both tunnels and then finding their intersection point P 25 marks