Question:

You are the manager of an assembly line with machines that

Last updated: 7/26/2022

You are the manager of an assembly line with machines that

You are the manager of an assembly line with machines that fill bags of trail mix. The machines are known to overfill bags 3% of the time. You think one machine is overfilling bags more often than that. A random sample of 65 bags filled by that machine reveals that 4 of the bags are overfilled. After performing a significance test at a significance level of α = 0.05, You calculate a p-value of 0.06811. Make a strategic decision based on this result. Allow the machine to continue operating as it is. Adjust the other machines to match the overfilling rate. Change the size of the bags used for the trail mix for this machine. Pause this machine's operation until it can be adjusted.